来源:山东聊城兴隆钢管有限公司 浏览次数:128 日期:2019-05-16 17:02
From the perspective of seamless steel pipe industry itself, it is difficult to improve the pressure of insufficient market demand for structural pipes, fluid pipes, low and medium pressure boiler pipes, the cost pressure caused by the low price drop of raw fuel for structural pipes, fluid pipes, low and medium pressure boiler pipes, and the financing cost pressure for structural pipes, fluid pipes, and low and medium pressure boiler pipes in a short period of time. From the perspective of domestic environment, the future is still more worrying than happy. It's all good news to give steel confidence.
"Winter" of seamless steel pipe industry market: it will take at least three to five years. "Domestic seamless steel tube enterprises, large and small, with high production capacity, have entered the" severe winter "in the face of the challenge of sluggish demand in the economic downturn to see who can last." This requires steel enterprises to seek new development mode of seamless steel tube industry through scientific and technological innovation, and seek new growth point and new profit mode of structu
Copyright © 2020 Xinglong steel pipe company All rights reserved 鲁ICP备12003301号-1 技术支持:开创云